You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Saluran Phb Pramuka Rampung

Jl. Pramuka PHB Channel Repaired

We have installed eight concretes for its culvert

Jalan Raya Pramuka Connecting (PHB) channel retaining wall, Matraman, East Jakarta that was damaged due to its old age and water erosion is currently finish being repaired.

Matraman Water Resources Unit Head, Meta Pradoningrum mentioned, her side has started its repair since the second week of July by installing 1x1 square meter concrete and repair it for 8 meters long.

Jl. Flamboyan PHB Channel's Retaining Wall Repaired

"We have installed eight concretes for its culvert," she informed, Tuesday (7/24). 

Besides repairing the retaining wall, her side needs to dredge material that clogged the channel due to many utility cables on the location.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye1652 personBudhi Firmansyah Surapati
  2. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1504 personDessy Suciati
  3. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye835 personBudhi Firmansyah Surapati
  4. Jakarta Provincial Government Anticipates the Impact of Volcanic Ash from Mount Anak Krakatau

    access_time06-09-2026 remove_red_eye689 personFolmer
  5. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye655 personFakhrizal Fakhri